September 17, 2026
Walk into a 1970s courtyard condo building on the flats of Santa Monica this fall and you will likely see fresh stucco, a repainted lobby, maybe a new gate code. Nothing about the building says "we still owe the city a seismic retrofit." That is the problem. The single most consequential fact about a soft-story building, whether it has actually finished its mandatory earthquake retrofit, does not show up on a walkthrough, a listing photo, or in most conversations a buyer has before writing an offer.
Here is the part that catches people off guard in 2026. According to Retrofit1, Santa Monica's mandatory retrofit deadlines for most soft-story buildings already passed, in September, October, and November of 2025. A calendar date that far in the rearview mirror feels like a settled question. It is not. The deadline passing is exactly the moment this got riskier for anyone buying into one of these buildings, because the financial cushion that was helping owners pay for it just closed its own application window on August 31, 2026, nine days before this was written, according to Prostruct Engineering.
Santa Monica's Seismic Retrofit Program, adopted in its current comprehensive form on March 28, 2017, identified roughly 2,000 buildings across the city as potentially vulnerable in an earthquake. About 1,700 of those are wood-frame soft-story buildings, the ones with parking, storage, or open commercial space on the ground floor and living space stacked above it. If a building was constructed before the mid-1970s with tuck-under parking, there is a real chance it is on that list.
Being on the list does not mean a building is unsafe. According to the City of Santa Monica, it means the city has flagged the construction type and ordered the owner to have it evaluated by a licensed structural or civil engineer. From there the building either gets a letter confirming no retrofit is required, or it moves into plan review, permitting, construction, and a final sign-off from a city building inspector. Only that final sign-off, not a permit application and not a contractor's invoice, counts as documented compliance.
This matters because California's standard disclosure paperwork will not do this homework for you. According to Custom Home, the state's Transfer Disclosure Statement requires a seller to disclose known seismic deficiencies, and the separate Natural Hazard Disclosure report tells you whether a property sits in an earthquake fault zone or a seismic hazard zone. Neither form is built to tell you whether a specific building's soft-story retrofit has cleared the city's final inspection. That is a separate check, and it is on the buyer's side to make it.
The city's compliance and noticing schedule staggered deadlines by building size, and most of them are now behind us.
| Building type | Compliance deadline |
|---|---|
| More than 2 stories, fewer than 16 units | September 2025 |
| 16 or more units | October 2025 |
| 2 stories, 7 to 15 units | November 2025 |
| 2 stories, fewer than 7 units | Varies by notice group, dates land in 2026 |
Notice which category is still trickling through this year: the small, two-story buildings with fewer than seven units. That description covers a lot of Santa Monica's smaller condo conversions and older duplex-to-fourplex stock, exactly the kind of property a first-time buyer or a small investor is likely to be looking at on the Westside. If you are shopping in that size range, you are shopping in the one bucket where "the deadline has passed" is not automatically true yet.
Even for the categories with deadlines already in the past, a passed deadline is not the same as a finished retrofit. A few years ago, city officials confirmed that of the roughly 2,000 buildings identified under the ordinance, 1,099 had reached compliance while nearly 900 had not. That gap existed heading into the final wave of deadlines. There is no mechanism that closes a construction project just because a date on a calendar arrived. Buildings that were mid-process in 2023 do not finish themselves.
Here is the piece of this that is easy to miss if you are not tracking it closely. The City of Santa Monica has been administering a FEMA-funded grant to help owners of qualifying soft-story buildings cover a portion of their design and construction costs. The application submission window for that grant closed August 31, 2026.
That date matters for anyone evaluating a building right now. An owner who applied before the deadline and got approved has a partial offset for what is often a six-figure project. An owner who missed that window, whether because the building was still working through structural analysis, because the HOA board moved slowly, or simply because nobody applied, is now facing the full, unsubsidized cost of the same work. Structural engineers who work on buildings this size across the Westside put combined design and construction costs somewhere between $50,000 and $200,000, sometimes more, depending on the building's configuration and how much steel framing the ground floor needs.
For a condo, that cost does not disappear into an abstract "the building" category. It becomes a special assessment, split across unit owners, or it shows up as a line item the HOA has been reserving for and may or may not have fully funded. For a small multifamily rental property, Santa Monica's rent stabilization rules allow owners to pass through a portion of certain retrofit costs to tenants, according to AAA Engineering Design, which is worth knowing if you are evaluating a small apartment building as an investment and trying to model actual cash flow rather than the number on the current rent roll.
A buyer's agent cannot legally certify a building's seismic status, and neither can a listing agent. What a good agent can do is help you ask the right questions and read the answers correctly.
Santa Monica adopted one of the strictest retrofit programs in the region for a reason rooted in its own history. The 1994 Northridge earthquake damaged or destroyed roughly 1,500 apartments in the city, about 5 percent of its total housing stock at the time, much of it in exactly this kind of wood-frame, soft-story construction. That experience is why the city built one of the more aggressive compliance schedules in Southern California.
If you are comparing a Santa Monica condo to something similar in a neighborhood with a newer or less mature retrofit ordinance, this is one of the real, non-obvious differences in what you are actually buying. The building's age and construction type matter here in a way that a median price per square foot will never capture.
Does a building being on the retrofit list mean it's unsafe? No. It means the construction type meets criteria that require an engineer's evaluation. Many buildings on the list are ultimately found compliant or exempt after that review.
Can I find out a building's status before I make an offer? Yes. Santa Monica maintains a public list and lookup tools for identified properties, and your agent can help you cross-reference an address before you're deep into a transaction.
If the retrofit is already paid for, does that show up anywhere? A completed retrofit should be reflected in the city's final permit sign-off and often in the HOA's reserve study or board minutes. Neither shows up automatically on a standard disclosure form, which is exactly why asking directly still matters.
If you're weighing a Santa Monica condo purchase, or you own one and are wondering how retrofit status might affect what your building is actually worth in this market, it's worth getting a clear read before you're mid-escrow. Lauren Morelli works these Westside buildings block by block and can help you get a free home valuation that accounts for what's actually happening inside the HOA, not just what's on the listing sheet.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.